received by mail / Wednesday, December 21, 2022
We sabotaged the 225.000Volts pylon on the main line that supplies electricity to the chemical-industrial pole of Salindres (Arkema company and others).
Method:
1) Sawing the crossbars.
Note: These are the bars that connect the legs together.
2) Sawing with oblique cuts on both legs in the direction of the fall.
Note: The tower must fall perpendicular to the cables.
3) Saw with straight cuts always on the same legs about 30 cm above the previous cuts.
Note: Saw all the way to the end to have a fully detachable piece.
4) Hit the sawn pieces still held in place by the gravity of the tower with a ram.
Note: a small tree trunk can be used
5) While the tower is falling, walk away with small steps in the opposite direction.
Note: hacksaws and oil are sufficient to perform this action.
Let’s take on the companies that poison the earth!
Whether in large groups during occupation/demonstrations or in small groups during sabotage/fires.
Strength to the individuals in struggle in France, Germany and elsewhere.
If the targets are too well protected, attacking the flows allows us to cut upstream while putting ourselves in less danger. Let’s go on the offensive!
Occupations, sabotage, fires,…
We do not defend nature, we are nature defending itself.
Resistance fighters.
Source: Attaque